+(90) 212 227 15 28
info@stas.com.tr
Caferağa Mah. Moda Cd. Özgür İş Hanı No: 28 Kat 6 34710 Kadıköy/İstanbul
Stay connected:

STAS Engineering sign new contract with Dal-Groups that made an investment in the cement project with Uzbek Almalyk Mining and Metallurgical Company (AMMC).

The Uzbekistan SURHANDERYA Cement Plant (4100 TPD) will be the second cement Plant contract project with Uzbekistan.

According to preliminary information, its capacity will total up to 1.5 million tonnes of Portland cement/year. The investments are estimated at some US$225 million (€208.94 million). Of that amount, about $90 million will be provided by the Uzbekistan Fund of Reconstruction and Development and US$24.4 million by the Almalyk MMC.

Uzbekistan currently has six cement plants with a total installed capacity of more than 7Mt/yr.

The largest of them are Kyzylkumcement (3.08Mt/yr), Akhangarancement (1.74Mt/yr) and JSC Kuvasaycement (920,000t/yr). Cement production in Uzbekistan in 2014 increased by 5.1% to 7.35Mt.

This is a significant win for STAS and builds up our reputation for delivering innovative solutions for cement industry markets worldwide.

For further information link: